Looking for Engineered Netting systems?

Structural Bolts Rep

Description:
Protec has provided structural bolts replacement at WGCC water slide during a narrow shutdown time.

Scope of work included but not limited to:

  • Safety organization and management along other ground level trades
  • Rigging
  • Rusted bolts removal/cutting
  • Parts installation and removal, torque adjustment
  • Description:
    Protec has provided structural bolts replacement at WGCC water slide during a narrow shutdown time.

    Scope of work included but not limited to:

    • Safety organization and management along other ground level trades
    • Rigging
    • Rusted bolts removal/cutting
    • Parts installation and removal, torque adjustment
    • Arrangement and delivery of all parts.
    Approach:

    Rope access.

    Project Completion time:

    2 weeks.


                   

Skills

Posted on

August 8, 2019