TATRAS Group has been involved in Granville Bridge Rehabilitation and Seismic Upgrades. The project started in 2019 and will take approximately 2 years to complete. The work performed by TATRAS takes place underneath the bridge deck which is an ultimate playground for our technicians to implement rope access climbing techniques and years of experience to get to hard-to-reach areas.
SCOPE OF WORK
Annual maintenance and review.
Cleaning was conducted using methods that didn’t damage the bridge paint coatings, lights, sensors, and other electrical/mechanical components. Power washing setup: low-pressure water jet cleaning method, maximum pressure of 3000psi, minimum standoff distance of 250mm, utilize zero degrees rotating nozzle. Tatras Group de-chlorinated the water in the truck tank prior to use.
Access and approach: Horizontal tension lines and aid climbing techniques will be used for an approach to achieve the minimum standoff distance of 250mm. Approach via rope access IRATA certified technicians only.
OTHER ITEMS INCLUDED:
Hoist system & banner installation. Old Mine crane system review and removal of overhead fall hazard debris and components.
Structural bolts replacement at WGCC water slide during a narrow shutdown time. Safety organization and management along other ground level trades, rigging, rusted bolts removal/cutting, parts installation and removal, torque adjustment.
Salt removal/cleaning after winter season from inaccessible locations. Visual inspection, photo documentation, delaminated concrete removal, repairs, sound test inspection, rigging, steel coating, stand-by-rescue, safety netting.
A pilot custom design netting system was also installed at the Ironworkers Bridge for MoT to review and potentially implement at all steel bridges across BC.
TATRAS Group has been involved in Granville Bridge Rehabilitation and Seismic Upgrades. The project started in 2019 and will take approximately 2 years to complete. The work performed by TATRAS takes place underneath the bridge deck which is an ultimate playground for our technicians to implement rope access climbing techniques and years of experience to get to hard-to-reach areas.
SCOPE OF WORK
Framing repairs, membrane replacement at all residential decks, rotten fascia boards replacement and sealant application.
We have used Sherwin Williams (paint) and Tremco(membrane) products, cedar fascia boards to provide long-lasting, DowSil sealant.
Pressure washing, envelope repairs, epoxy injection, leak investigation and full exterior re-coating. Painting all EIFS surfaces.
Material: DowSil Allguard silicone elastomeric coating.
Mortar joints removal of all inaccessible and accessible locations at the roof eyebrow.
Our crew have worked on mortar joints for building improvement during a day and night allowing all businesses and students classes operate as usual at SFU AQ Building.
Exterior sealant application – sealing of all window wall system assembly components (headers, sill flashings, transitions to the curtain wall system). 80,000 LN FT.
Materials: DowSil CWS- various colors.
Structural Sealant application – interior perimeter sealing of the structural panel assembly. 20,000 LN FT. GE Silpruf SCS2000.
Paint removal & membrane removal. Full Building Remediation including stucco repairs, complete repainting, leak investigations/ humidity sensors installation, EIFS renovation.
Sealant application – sealant application at the window perimeters (headers, side jambs, sill flashings, by-pass windows). 25,000 LN FT.
Materials: Tremco Tremsil 400 – anodized aluminum.
Self-adhesive membrane and sealant application
A pilot custom design netting system was also installed at the Ironworkers Bridge for MoT to review and potentially implement at all steel bridges across BC.
TATRAS Group has been involved in Granville Bridge Rehabilitation and Seismic Upgrades. The project started in 2019 and will take approximately 2 years to complete. The work performed by TATRAS takes place underneath the bridge deck which is an ultimate playground for our technicians to implement rope access climbing techniques and years of experience to get to hard-to-reach areas.
SCOPE OF WORK